Overview of Microgrid Results

Microgrid Name Generation Bus Minimum 1 hr Load (kW) Average 1 hr Load (kW) Average Daytime 1 hr Load (kW) Maximum 1 hr Load (kW) Minimum 1 hr Critical Load (kW) Average 1 hr Critical Load (kW) Average Daytime 1 hr Critical Load (kW) Maximum 1 hr Critical Load (kW) Existing Fossil Generation (kW) New Fossil Generation (kW) Existing Solar (kW) New Solar (kW) Existing Battery Power (kW) Existing Battery Energy Storage (kWh) New Battery Power (kW) New Battery Energy Storage (kWh) Existing Wind (kW) New Wind (kW) Total Generation on Microgrid (kW) Renewable Generation (% of Annual kWh) Emissions (Yr 1 Tons CO2) Emissions Reduction (Yr 1 % CO2) Average Outage Survived (h) O+M Costs (Yr 1 $ before tax) CapEx ($) CapEx after Tax Incentives ($) Net Present Value ($)
mg0 633 789 1,493 1,913 2,713 60 178 248 306 0 110 440 1,223 79 307 100 64 0 0 1,953 17 5,431 13 77 32,748 2,429,646 1,495,772 492,265
mg1 645 789 1,493 1,913 2,713 9 50 77 160 0 30 0 640 0 0 120 231 0 0 790 7 6,123 7 1,279 12,272 1,501,938 1,004,941 247,865
mg2 670 789 1,493 1,913 2,713 503 863 1,052 1,355 81 743 800 3,086 20 100 435 1,076 0 0 5,165 37 4,075 32 204 91,161 6,829,027 4,450,079 -117,435
Summary None 789 1,493 1,913 2,713 572 1,091 1,377 1,821 81 883 1,240 4,949 99 407 655 1,371 0 0 7,908 20 15,629 17 77 136,181 10,760,611 6,950,792 622,695

Report Generated

2024-07-30 13:28:51.574636

User Warnings

Pre-existing battery battery_634_existing will not be utilized to support loads in microgrid mg0.
Supporting critical loads across microgrids assumes an AMI metering system. If not currently installed, add budget for the creation of an AMI system.
More than one load voltage is specified on microgrid mg2. Check Oneline diagram to verify that phases and voltages of ['684_command_center', '692_warehouse2', '675a_hospital', '675b_residential1', '675c_residential1', '611_runway', '652_residential', '670a_residential2', '670b_residential2', '670c_residential2'] are correctly supported by gen_bus 670.
Pre-existing battery battery_684_existing will not be utilized to support loads in microgrid mg2.
Supporting critical loads across microgrids assumes the ability to remotely disconnect 3-phase loads.

Distribution Upgrades needed to create Microgrids

Microgrid Location Recommended Upgrade Component Count Cost Estimate ($)
mg0 mg0 Microgrid Design 1 100,000
mg0 mg0 Microgrid Controls 1 100,000
mg0 632633 SCADA disconnect switch 1 50,000
mg0 634a_data_center AMI disconnect meter(s) 1 300
mg0 634b_radar AMI disconnect meter(s) 1 300
mg0 634c_atc_tower AMI disconnect meter(s) 1 300
mg1 mg1 Microgrid Design 1 100,000
mg1 mg1 Microgrid Controls 1 100,000
mg1 632645 SCADA disconnect switch 1 50,000
mg1 645_hangar AMI disconnect meter(s) 1 300
mg1 646_office AMI disconnect meter(s) 1 300
mg2 mg2 Microgrid Design 1 100,000
mg2 mg2 Microgrid Controls 1 100,000
mg2 632670 SCADA disconnect switch 1 50,000
mg2 684_command_center AMI disconnect meter(s) 1 300
mg2 692_warehouse2 3-phase relay(s) 1 20,000
mg2 675a_hospital 3-phase relay(s) 1 20,000
mg2 675b_residential1 3-phase relay(s) 1 20,000
mg2 675c_residential1 3-phase relay(s) 1 20,000
mg2 611_runway AMI disconnect meter(s) 1 300
mg2 652_residential AMI disconnect meter(s) 1 300
mg2 670a_residential2 AMI disconnect meter(s) 1 300
mg2 670b_residential2 AMI disconnect meter(s) 1 300
mg2 670c_residential2 AMI disconnect meter(s) 1 300

Description